Dinaric Alps: new lifts 2026/2027
All new lifts in the Dinaric Alps for the 2026/2027 season
Overview: new ski lifts in the Dinaric Alps 2026/2027
New lifts at ski resorts in the Dinaric Alps : renewal of ski lifts or ski resort expansions in the Dinaric Alps
Total: 8
4 1 2 1
Add lifts and cable cars? Please report here
Dinaric Alps: new ski lifts 2026/2027
- Dinaric Alps – switch to
Countries:
1-6 out of 6 ski resorts
Combined installation (6 pers. chair and 8 pers. gondola)
Manufacturer: LEITNER
10pers. Gondola lift (monocable circulating ropeway)
Length: 5369 m
Carrying capacity/hour: 1200
Manufacturer: LEITNER
8pers. Gondola lift (monocable circulating ropeway)
Length: 1800 m
Carrying capacity/hour: 2400
4pers. High speed chairlift (detachable)
Length: 1790 m
Carrying capacity/hour: 2400
4pers. High speed chairlift (detachable)
Length: 1500 m
Carrying capacity/hour: 2400
8pers. Gondola lift (monocable circulating ropeway)
Length: 3500 m
Carrying capacity/hour: 2000
10pers. Gondola lift (monocable circulating ropeway)
Length: 5369 m
Carrying capacity/hour: 1200
Manufacturer: LEITNER
8pers. Gondola lift (monocable circulating ropeway)
Carrying capacity/hour: 2400
1-6 out of 6 ski resorts