Aosta Valley (Valle d'Aosta): planned lifts
All planned lifts in the Aosta Valley (Valle d'Aosta)
Overview: planned ski lifts in the Aosta Valley (Valle d'Aosta)
Lift projects at ski resorts in the Aosta Valley (Valle d'Aosta) (renewal, development and integration)
Total: 10
1 3 4 2
Add lifts and cable cars? Please report here
See also:
New lifts 2026/2027
Aosta Valley (Valle d'Aosta): planned ski lifts
- Aosta Valley (Valle d'Aosta) – limit to
Tourism regions:
Aosta Valley (Valle d'Aosta) – switch toMountain ranges:
1-4 out of 4 ski resorts
28pers. Tricable ropeway
28pers. Tricable ropeway
8pers. Gondola lift (monocable circulating ropeway)
Carrying capacity/hour: 2000
6pers. High speed chairlift (detachable) with bubble
Length: 3500 m
Carrying capacity/hour: 2400
4pers. High speed chairlift (detachable)
Length: 2000 m
Carrying capacity/hour: 2400
6pers. High speed chairlift (detachable)
Length: 2796 m
Carrying capacity/hour: 2400
100pers. Aerial tramway/Reversible ropeway
Length: 1480 m
Carrying capacity/hour: 1200
4pers. High speed chairlift (detachable) with bubble
Length: 1476 m
Carrying capacity/hour: 2400
1-4 out of 4 ski resorts