China: planned lifts
All planned lifts in China
Overview: planned ski lifts in China
Lift projects at ski resorts in China (renewal, development and integration)
Total: 7
1 3 3
Add lifts and cable cars? Please report here
See also:
New lifts 2026/2027
China: planned ski lifts
- China – limit to
Areas:
Provinces:
1-3 out of 3 ski resorts
4pers. High speed chairlift (detachable)
Length: 1550 m
Carrying capacity/hour: 2000
Manufacturer: BMHRI
Combined installation (6 pers. chair and 8 pers. gondola)
Length: 1164 m
Carrying capacity/hour: 2400
Manufacturer: Doppelmayr
Combined installation (6 pers. chair and 8 pers. gondola)
Length: 1411 m
Carrying capacity/hour: 2400
Manufacturer: Doppelmayr
Combined installation (6 pers. chair and 8 pers. gondola)
Length: 1400 m
Carrying capacity/hour: 2400
Manufacturer: Doppelmayr
6pers. High speed chairlift (detachable) with bubble
Length: 1377 m
Carrying capacity/hour: 2000
Manufacturer: Doppelmayr
6pers. High speed chairlift (detachable) with bubble
Length: 1356 m
Carrying capacity/hour: 2000
Manufacturer: Doppelmayr
1-3 out of 3 ski resorts