Mountain Collective: planned lifts
All planned lifts in the Mountain Collective Pass area of validity
Overview: planned ski lifts in the Mountain Collective Pass area of validity
Lift projects at ski resorts in the Mountain Collective Pass area of validity (renewal, development and integration)
Total: 32
1 4 21 5 1
Add lifts and cable cars? Please report here
See also:
New lifts 2026/2027
Mountain Collective: planned ski lifts
- Mountain Collective – switch to
Countries:
1-15 out of 15 ski resorts
4pers. High speed chairlift (detachable) with bubble
Length: 1027 m
Carrying capacity/hour: 2800
6pers. High speed chairlift (detachable)
Length: 2194 m
Carrying capacity/hour: 2400
Manufacturer: Leitner-Poma
8pers. Gondola lift (monocable circulating ropeway)
Length: 2900 m
Carrying capacity/hour: 2000
Manufacturer: Nippon Cable
6pers. High speed chairlift (detachable)
Length: 1854 m
Carrying capacity/hour: 2400
Manufacturer: LEITNER
4pers. High speed chairlift (detachable)
Length: 1350 m
Carrying capacity/hour: 2400
4pers. Chairlift (fixed-grip)
Carrying capacity/hour: 2000
Manufacturer: Doppelmayr
6pers. High speed chairlift (detachable) with bubble
Length: 1266 m
Carrying capacity/hour: 3000
6pers. High speed chairlift (detachable)
Length: 1061 m
Carrying capacity/hour: 2800
6pers. High speed chairlift (detachable)
Length: 937 m
Carrying capacity/hour: 3000
6pers. High speed chairlift (detachable)
Length: 1743 m
Carrying capacity/hour: 3000
Manufacturer: Poma
6pers. High speed chairlift (detachable)
Length: 2629 m
Carrying capacity/hour: 3000
Manufacturer: Poma
J-bar
Length: 338 m
Carrying capacity/hour: 900
32pers. Tricable ropeway
Length: 14000 m
Carrying capacity/hour: 3600
4pers. High speed chairlift (detachable)
Carrying capacity/hour: 2000
6pers. High speed chairlift (detachable)
Length: 1914 m
Carrying capacity/hour: 3000
4pers. High speed chairlift (detachable)
Length: 573 m
Carrying capacity/hour: 2400
4pers. High speed chairlift (detachable)
Length: 760 m
Carrying capacity/hour: 2000
4pers. High speed chairlift (detachable)
Length: 850 m
Carrying capacity/hour: 2400
32pers. Tricable ropeway
Length: 14000 m
Carrying capacity/hour: 3600
4pers. High speed chairlift (detachable)
Length: 1310 m
Carrying capacity/hour: 2400
J-bar
Carrying capacity/hour: 720
Manufacturer: Leitner-Poma
4pers. High speed chairlift (detachable)
Length: 1200 m
Carrying capacity/hour: 2000
10pers. Gondola lift (monocable circulating ropeway)
Length: 2700 m
Carrying capacity/hour: 2400
Manufacturer: Doppelmayr
6pers. High speed chairlift (detachable)
Carrying capacity/hour: 3000
24pers. Tricable ropeway
Length: 2920 m
Carrying capacity/hour: 1800
Manufacturer: Doppelmayr
1-15 out of 15 ski resorts