Mountain Collective: new lifts 2018/2019
All new lifts in the Mountain Collective Pass area of validity for the 2018/2019 season
Overview: new ski lifts in the Mountain Collective Pass area of validity 2018/2019
New lifts at ski resorts in the Mountain Collective Pass area of validity : renewal of ski lifts or ski resort expansions in the Mountain Collective Pass area of validity
Total: 11
1 6 2 2
Add lifts and cable cars? Please report here
Mountain Collective: new ski lifts 2018/2019
- Mountain Collective – switch to
Countries:
1-7 out of 7 ski resorts
8pers. High speed chairlift (detachable) with bubble and seat heating
Length: 1395 m
Carrying capacity/hour: 3200
Manufacturer: Doppelmayr
4pers. High speed chairlift (detachable)
4pers. Chairlift (fixed-grip)
Length: 1084 m
Carrying capacity/hour: 1028
Manufacturer: Doppelmayr
Combined installation (6 pers. chair and 8 pers. gondola)
4pers. Chairlift (fixed-grip)
Length: 150 m
Carrying capacity/hour: 1200
Manufacturer: Skytrac Inc.
People mover/Moving Carpet with cover
Length: 108 m
Carrying capacity/hour: 1600
Manufacturer: Sunkid
People mover/Moving Carpet with cover
Length: 75 m
Carrying capacity/hour: 1600
Manufacturer: Sunkid
4pers. High speed chairlift (detachable)
Length: 1140 m
Carrying capacity/hour: 2400
Manufacturer: Leitner-Poma
6pers. High speed chairlift (detachable)
Length: 959 m
Carrying capacity/hour: 2800
Manufacturer: LEITNER
J-bar
Length: 108 m
Carrying capacity/hour: 770
Manufacturer: LEITNER
1-7 out of 7 ski resorts