Schwyz Alps: planned lifts
All planned lifts in the Schwyz Alps
Overview: planned ski lifts in the Schwyz Alps
Lift projects at ski resorts in the Schwyz Alps (renewal, development and integration)
Total: 3
1 1 1
Add lifts and cable cars? Please report here
See also:
New lifts 2026/2027
Schwyz Alps: planned ski lifts
- Schwyz Alps – switch to
Tourism region:
Cantons:
1-3 out of 3 ski resorts
4pers. Chairlift (fixed-grip)
Length: 1590 m
Carrying capacity/hour: 1400
Manufacturer: Garaventa
10pers. Gondola lift (monocable circulating ropeway)
Length: 2330 m
Carrying capacity/hour: 1200
Manufacturer: Garaventa
Rope tow/baby lift with low rope tow
Length: 100 m
Carrying capacity/hour: 500
1-3 out of 3 ski resorts