With the new Hirschbichllift II, the existing Hirschbichllift I in the Hochzillertal ski area will be further enhanced. The new lift runs almost parallel to the existing one, providing a more efficient and comfortable transport option in this area. The additional capacity helps to reduce waiting times and better distribute the flow of guests. This further optimizes access to the ski area in the Zillertal and makes the skiing experience even more enjoyable for guests.
Lift name
Hirschbichllift II
Status
planned
Type
J-bar
Year of construction
planned
2026
2026
Height/length
Base station 2080 m Top station 2145 m 65 m 415 m
Speed
2.50 metres per second
Transit time
2:47 minutes
Carrying capacity
900 people per hour
Ski resort area
Kaltenbach – Hochzillertal/Hochfügen (SKi-optimal) [Hochzillertal]
Towns/villages at the ski resort (distance from town center):
Kaltenbach (0.4 km), Hochfügen (0.1 km), Aschau im Zillertal (4 km), Ried Towns/villages at the ski resort
Kaltenbach (0.4 km), Hochfügen (0.1 km), Aschau im Zillertal (4 km), Ried Towns/villages at the ski resort
Feedback for the Skiresort Team? Please use this form
Book this ski resort
